Harris County Logo
File #: 24-2231    Version: 1 Name:
Type: Negotiation Status: Agenda Ready
File created: 4/10/2024 In control: Commissioners Court
On agenda: 4/23/2024 Final action:
Title: Request for approval to negotiate an agreement with Raba Kistner, Inc. to provide materials engineering and testing services in support of the TC Jester Stormwater Detention Basin project on HCFCD Unit K500-23-00. (Cypress Creek Watershed, Bond ID Z-02, Project ID K500-23-00-E003, Precinct 3).
Attachments: 1. 042324 ATN RABA KISTNER 2024-30 PCT 3 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

Project ID (if applicable): K500-23-00-E003
Vendor/Entity Legal Name (if applicable): Raba Kistner, Inc.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to negotiate an agreement with Raba Kistner, Inc. to provide materials engineering and testing services in support of the TC Jester Stormwater Detention Basin project on HCFCD Unit K500-23-00. (Cypress Creek Watershed, Bond ID Z-02, Project ID K500-23-00-E003, Precinct 3).
end

Background and Discussion:
This is a request to authorize negotiation for an agreement that will provide stormwater detention in the Cypress Creek Watershed to reduce flood levels and the overall risk of flooding for nearby structures. This project is located in the northern portion of Harris County, Texas within the Cypress Creek Watershed and includes excavation of three detention basins.

Expected Impact:
Materials engineering and testing services under this agreement will provide essential quality control and assurance, ensuring that soils and construction materials meet specified standards and performance criteria, ultimately leading to enhanced structural integrity and longevity while reducing risks and costs associated with earthen and material failures. This quality control and assurance will help ensure that flood risk reduction projects are constructed properly.

Alternative Options:
An alternative option would be to select another consultant; however, that would result in delays to this project, further delaying flood risk reduction in the area.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Tra...

Click here for full text