Title: Request for approval of a change in contract with WadeCon, LLC in connection with Lynwood Estates Subdivision Drainage Improvements - 2018, Job No. 22/0183-3, UPIN 19104MF16H01, Precinct 3, MWDBE Contracted Goal: 21%.
Sponsors: Mony Hossain
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 19104MF16H01 - Job No. 22/0183
Vendor/Entity Legal Name (if applicable): Wadecon, LLC

MWDBE Contracted Goal (if applicable):21.00%
MWDBE Current Participation (if applicable):0.00%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with WadeCon, LLC in connection with Lynwood Estates Subdivision Drainage Improvements - 2018, Job No. 22/0183-3, UPIN 19104MF16H01, Precinct 3, MWDBE Contracted Goal: 21%.
end

Background and Discussion:
The Lynwood Estates Subdivision is located in Precinct 3, north of Beltway 8 and west of Hardy Service Rd. The project will improve the existing public drainage system in order to reduce ponding during the 2-year, 10-year, and 100-year storm events. The improvements include upsizing existing inlets, installing storm sewers and upsizing the system's outfall to reinforced concrete boxes, and adding a detention pond to avoid adverse impacts to the receiving waterways.

The Change in contract request includes the following:
* PCO -21. Adding new line items for enclosed structure along Megan Street and detention pond entrance as per design plans due to safety concerns at the request of Precinct. The change in quantities is being balanced out from funds that will be unutilized on other line items. Added 1 lumpsum new line item #091- Enclosed Structure along Megan St and Detention Pond, lumpsum and deduct of the following items including 122 linear feet from existing Line item #030- Precast Reinforced Concrete Boxes (6X3), 5 each from existing Line Item #028-Modified Type A inlet, 2 each from existing Line Item #027- Type A inlet with concrete apron and 19 linear feet from existing L...