File #: 23-0695    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 1/23/2023 In control: Commissioners Court
On agenda: 1/31/2023 Final action: 1/31/2023
Title: Request for approval to execute a Utility Adjustment Agreement with Enterprise Crude Pipeline LLC to perform Engineering and Construction relocation in connection with Roland Road and Related Infrastructure Drainage Improvements - 2018, (Katy Pointe Sections 1 & 2), UPIN 19103MF14C01, Precinct 4.
Attachments: 1. 23-0695 Partnership - Roland Rd - Enterprise Products.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): UPIN 19103MF14C01
Vendor/Entity Legal Name (if applicable): Enterprise Products Operating LLC.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to execute a Utility Adjustment Agreement with Enterprise Crude Pipeline LLC to perform Engineering and Construction relocation in connection with Roland Road and Related Infrastructure Drainage Improvements - 2018, (Katy Pointe Sections 1 & 2), UPIN 19103MF14C01, Precinct 4.
end

Background and Discussion:
The project is located within the South Mayde Creek Watershed in western Harris County. The Roland Road subdivision consist of mainly roadside ditches and has been subjected to several flooding events. The scope and proposed improvements include surface collection, ditch grading and storm sewer conveyance of the drainage along Roland Road. The existing HCFCD U201-09-00 channel will be extended from Porter Road to Katy Hockley Cutoff Road to provide reduction in inundation of the subdivision. This Utility Adjustment Agreement allows the project to move forward with the improvements as intended.

Expected Impact:
This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This agreement is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Roland Road and Related Infrastructure project area and surrounding homeowners, Harris County, and FEMA. The fiscal impact for this project will c...

Click here for full text