File #: 23-0499    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 1/19/2023 In control: Commissioners Court
On agenda: 1/31/2023 Final action: 1/31/2023
Title: Request for approval to negotiate an agreement with Gunda Corporation, LLC for design, bidding and construction phase engineering services in support of a detention basin at HCFCD Unit Q534-01-00. (Cedar Bayou Watershed, Bond ID F-45, Project ID Q534-01-00-E002, Precinct 3).
Attachments: 1. 013123 ATN GUNDA 2022-209 PCT 3 backup
Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

Project ID (if applicable): Q534-01-00-E002
Vendor/Entity Legal Name (if applicable): Gunda Corporation, LLC

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to negotiate an agreement with Gunda Corporation, LLC for design, bidding and construction phase engineering services in support of a detention basin at HCFCD Unit Q534-01-00. (Cedar Bayou Watershed, Bond ID F-45, Project ID Q534-01-00-E002, Precinct 3).
end

Background and Discussion:
The Q134-00-00 sub-watershed has a long history of flooding and has been included in past watershed-wide studies. A drainage improvement project that will provide water surface elevation reductions within the sub-watershed was identified in a preliminary engineering report. This court action is to allow the HCFCD to proceed with the design stage for the project. Request for approval to execute the agreement with Gunda Corporation, LLC for Engineering Services to provide design for the regional stormwater detention basin HCFCD Unit Q534-01-00. This project scores in the 2nd quartile under the 2022 Prioritization Framework approved by Commissioners Court.

Expected Impact:
This project is part of the Cedar Bayou Bond Implementation Program that could reduce flood risks in the area. The design stage of the Q534-01-00 project will impact staffing and operations for twelve calendar months. The total proposed amount for the design stage is $569,490. The proposed amount fits within the existing bond budget.

Alternative Options:
The alternative should this agreement request not be approved is that the HCFCD will not be able to proceed with design stage of ...