File #: 22-5740    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 9/15/2022 In control: Commissioners Court
On agenda: 9/27/2022 Final action: 9/27/2022
Title: Transmittal by the Flood Control District of a preliminary engineering report dated August 2022 and prepared by CivilTech Engineering Inc., for the Westador Stormwater Detention Basin, HCFCD Unit K500-27-00. (Cypress Creek Watershed, Bond ID F-88, Project ID K500-27-00-E001, Precinct 1).
Attachments: 1. 092722 TRANMITTAL PER K500-27-00-E001 PCT 1 backup
Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): K500-27-00-E001
Vendor/Entity Legal Name (if applicable): N/A

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report dated August 2022 and prepared by CivilTech Engineering Inc., for the Westador Stormwater Detention Basin, HCFCD Unit K500-27-00. (Cypress Creek Watershed, Bond ID F-88, Project ID K500-27-00-E001, Precinct 1).
end

Background and Discussion:
The purpose of the Preliminary Engineering Report (PER) was to examine potential design alternatives for the Westador Stormwater Detention Basin that was identified in the Cypress Creek Watershed Major Tributaries Regional Drainage Plan by Michael Baker International, dated February 2020 that recommended 26,546 acre-feet of detention volume throughout Cypress Creek Watershed. The PER was prepared by CivilTech Engineering, Inc. and is entitled "Westador Stormwater Detention Basin PER Phase K500-27-00-E001" dated August 2022. A community Engagement Meeting was held for this project on February 3rd, 2022.

Expected Impact:
The acceptance of this PER will allow the Flood Control District to move into the engineering stage of this project.

Alternative Options:
The alternative should this PER not be accepted is that the District will not be able to proceed to the design phase of this project.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any): N/A
Date
Agenda Item #
Action Taken




Location: The proposed basins...

Click here for full text