File #: 24-0941    Version: 1 Name:
Type: Proposals/Bids Status: Passed
File created: 2/13/2024 In control: Commissioners Court
On agenda: 2/27/2024 Final action: 2/27/2024
Title: Request for approval to reject the bid(s) received for detention pond enhancement at Goforth Park for Precinct 3, and that the project be readvertised at a later date (230464).
Attachments: 1. 24-0941 Reject for Job No. 230464
Department: Purchasing
Department Head/Elected Official: DeWight Dopslauf

Regular or Supplemental RCA: Regular RCA

Type of Request: Proposals/Bids

Project ID (if applicable): 230464
Vendor/Entity Legal Name (if applicable): N/A

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to reject the bid(s) received for detention pond enhancement at Goforth Park for Precinct 3, and that the project be readvertised at a later date (230464).
end

Background and Discussion:

Harris County desires to reject the bid received by CE Barker Ltd. and re-advertise the construction of the project with revised specifications. Only one bid was received and it was nearly three times the amount of the engineer's estimate. Therefore the project specifications are being revised and the project is to be re-advertised. The goal of the project is to reduce area flood risk by maximizing the detention volume prior to rain event.

Expected Impact:

The project intends to reduce area flood risk by maximizing the detention volume prior to rain event.

Alternative Options:

If no action is taken, the public may experience greater flood risk than if the action is taken.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
12/19/2023
343
Transmittal by Purchasing of a project scheduled for advertising

Location:
Address (if applicable): Goforth Park
Precinct(s): Precinct 3

Fiscal and Personnel Summary
Service Name



Current Fiscal Year Cost
Annual Fiscal Cost

Labor
Non-Labor
Total
Recurring Expenses
Funding Sources

Existing Budget




1000 - General Fund
$
$
$
$
Choose an item.
$
$
$
$
Choose an item.
$
$
$
$
Total Curr...