Harris County Logo
File #: 23-2917    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 5/9/2023 In control: Commissioners Court
On agenda: 5/16/2023 Final action: 5/16/2023
Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy and to authorize the County Auditor to pay monthly bills for 23610 1/2 Clay Rd, Katy, TX 77493 (intersection of Clay Rd at Ventana Prairie Dr) for electrical power serving a traffic signal, Precinct 4.
Attachments: 1. 23-2917 SOLS - Clay Rd P4.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD., P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 22035MF28601
Vendor/Entity Legal Name (if applicable): CenterPoint Energy

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy and to authorize the County Auditor to pay monthly bills for 23610 1/2 Clay Rd, Katy, TX 77493 (intersection of Clay Rd at Ventana Prairie Dr) for electrical power serving a traffic signal, Precinct 4.
end

Background and Discussion:
Constructing a traffic signal at Clay Rd at Ventana Prairie Dr is to enhance the public safety and operation of the existing intersection. The service outlet location statement is needed to establish electrical service from CenterPoint Energy to power the traffic signal.

Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy to provide electrical service to the traffic signal, which is needed to enhance the public safety and operation of the intersection of Clay Rd at Ventana Prairie Dr.

Alternative Options:
All Traffic Signals require a power source, which is typically obtained through CenterPoint Energy. Alternative options are to place a generator, which is not reliable, or not install the traffic signal from the intersection. Both options pose a public safety concern and will impact the operation and increase delay of the intersection.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
x Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda...