File #: 23-2900    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 5/9/2023 In control: Commissioners Court
On agenda: 5/16/2023 Final action: 5/16/2023
Title: Request for approval to execute an agreement with Jacobs Engineering Group, Inc. in the amount of $115,514.93 for Professional Engineering and related services to construct and provide drainage improvements to the Fallbrook, Ridgepoint, and WestPoint Subdivisions, UPIN 19104MF13401, Precinct 2, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.
Attachments: 1. 23-2900 Consultant - Jacobs Fallbrook P2.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 19104MF13401; Job No: 23/0074
Vendor/Entity Legal Name (if applicable): Jacobs Engineering Group, Inc.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Jacobs Engineering Group, Inc. in the amount of $115,514.93 for Professional Engineering and related services to construct and provide drainage improvements to the Fallbrook, Ridgepoint, and WestPoint Subdivisions, UPIN 19104MF13401, Precinct 2, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.
end

Background and Discussion:
The Fallbrook, Ridgepoint, Westpoint project area is in the Halls Bayou Watershed, a tributary of Greens Bayou. These subdivisions were constructed in different timelines, Fallbrook in early 1970's, Ridgepoint in early 1980's and Westpoint in early 2000's. The existing drainage system was designed based on the current design criteria and design rainfall. The drainage system in the project area consists of inlets and storm sewers that eventually outfall into HCFCD channel (P118-31-00) which eventually drains into Halls Bayou (P118-00-00). The original scope of work for this project consists of improvements such as widening the P118-31-00 channel, upsizing storm sewer, replacing inlets and pavement as needed to accommodate for the increased conveyance in the Fallbrook subdivision. This agreement for Construction Phase Services provided by Jacobs Engineering Group, Inc. ensures that the project is built in accordance with the Harris County and Harris County Flo...