Title: Request for approval to execute a Joint Participation Interlocal Agreement with the City of Houston to share in the cost of an Engineering Design Concept Report for Aldine Westfield Road from Beltway 8 to Pine Tree Drive and all related appurtenances, UPIN 23102MF2NG01, Precinct 2.
Attachments: 1. 23-0144 Partnership - COH Aldine Westfield P2.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): UPIN 23102MF2NG01
Vendor/Entity Legal Name (if applicable): City of Houston

MWDBE Contracted Goal (if applicable):N/A
MWDBE Current Participation (if applicable):N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to execute a Joint Participation Interlocal Agreement with the City of Houston to share in the cost of an Engineering Design Concept Report for Aldine Westfield Road from Beltway 8 to Pine Tree Drive and all related appurtenances, UPIN 23102MF2NG01, Precinct 2.
end

Background and Discussion:
An interlocal agreement was requested to assist in the preparation of an engineering Design Concept Report for the major transportation corridor to provide the necessary information in order to plan for further utilization of the roadway to facilitate current and future traffic and infrastructure. The document is required by the City of Houston to provide for the Mobility and Planning Process.

Expected Impact:
This study will allow for the incorporation of current infrastructure design along with policies and programs that will provide for community input while meeting future transportation needs.

Alternative Options:
Postponing the study would lengthen the process to provide improvments along the corridor and stymie economic progress of the surrounding areas.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
_ Environment
X Governance and Customer Service

Prior Court Action (if any): N/A
Date
Agenda Item #
Action Taken




Location:
Address (if applicable): From Beltway 8 North to Pine Tree Drive
Precinct(s): Precinct 2

Fiscal and Personnel Summary
Service Name


...

Click here for full text