Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): UPIN 17102MF0N102
Vendor/Entity Legal Name (if applicable): Huitt-Zollars, Inc.
MWDBE Contracted Goal (if applicable): 90%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval to execute an amendment with Huitt-Zollars, Inc. in the amount of $7,860.00 for Professional Engineering Services to provide improvements to Atascocita Area Trails Phase 2, UPIN 17102MF0N102, Precinct 3 (MWDBE Contracted Goal 90%).
end
Background and Discussion: The County engaged Huitt-Zollars, Inc. in 2020, and now seeks Huitt-Zollars, Inc., to facilitate the re-design of an 8' wide concrete shared-use pedestiann/bike trail along Rogers Gully (G103-24-04). The re-design revisions to project limits and alignment include removing from the scope: sidewalk from Pine Cup Drive to W Lake Houston Parkway (WLHP) that curves around Pine Forest Elementary; sidewalk from WLHP across from Pine Cup Drive to channel G103-24-00, only spot-fix areas that are non-ADA compliant, if they exist; sidewalk improvements across G103-24, existing sidewalk to remain; sidewalk from east of FM 1960 (TxDOT tie-in) to east of Farmingham Road; sidewalk improvements from Rogers Gully along north side of Farmingham Road, existing sidewalk to remain; sidewalk on south side of Farmingham Road from Rogers Gully to Walden Forest Drive, except small section from Chip Shot Street to the existing crosswalk near the field; east side WLHP sidewalk from FM 1960 to Tournament Trails Drive; and sidewalk along north side WLHP along G103-24-00. Huitt-Zollars, Inc. is qualified to perform these professional services. The firm is registered with the Harris County Eng...
Click here for full text