File #: 22-5496    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/6/2022 In control: Commissioners Court
On agenda: 9/13/2022 Final action: 9/13/2022
Title: Request for approval to execute an amendment with WSP USA Inc. for Professional Engineering Services to provide Drainage improvements to Hidden Meadow Subdivision, UPIN 19101MF14N01, Precinct 1, MWDBE Contracted Goal 13%.
Attachments: 1. 22-5496 Consultant - WSP USA Inc Hidden Meadows P1.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, PE, PMP, CFM, County Engineer


Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 19101MF14N01
Vendor/Entity Legal Name (if applicable): WSP USA Inc.

MWDBE Contracted Goal (if applicable): 13%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval to execute an amendment with WSP USA Inc. for Professional Engineering Services to provide Drainage improvements to Hidden Meadow Subdivision, UPIN 19101MF14N01, Precinct 1, MWDBE Contracted Goal 13%.
end

Background and Discussion:
The study area is in Northeast Harris County and is generally bounded by East Little York Road to the north, C. E. King Parkway to the west, Harris County Flood Control District (HCFCD) Tributary P121-00- 00 to the south, and Beltway 8 to the east. The study area encompasses the Hidden Meadow subdivision, Sections 1 through 6. Phase I of the Hidden Meadow development consists of Sections 1 to 5, and Section 6 belongs to Phase II. Based on the as-built drawings, the study area is served by a storm sewer system consisting of curb inlets and reinforced concrete pipes (RCPs). Most of the study area (Sections 1, 3, 4, 5) drains to a 54" RCP trunkline along Montclair Bend Lane and outfalls to the 56 acre-feet Phase I detention basin on the southern edge of the study area before emptying into P121-00-00 through a 54" corrugated metal pipe (CMP). Section 2 is on the southeast corner of the study area and drains directly to the Phase I detention basin. Meanwhile, Section 6 is on the northeast corner drains to the north, away from to rest of the study area, and flow enters a 60" RCP trunkline along East Little York Road which outfalls to the Phase II detention basin located directly east of the study area. The P...