Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): N/A
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval to execute a Facilities Use Agreement with Vertical Life Church for use of the facility for a public meeting for the Recovery & Resiliency Division projects at Bernadine Estates (UPIN 19103MF12J01) and Dula Lane (UPIN 22208MF2H701), Precinct 3.
end
Background and Discussion:
The Bernadine Estates project is located in northwest Harris County in the White Oak Bayou watershed. Bernadine consists of roadside ditches that drains into HCFCD channel E132-00-00. The scope and proposed improvements are to regrade roadside ditches, install a storm sewer system under one side of ditches, upsize culverts, and reconstruct roadways within the neighborhood. Additionally, detention ponds will be required for mitigation within the project limits. Improvements will comply with Harris County standards.
The Dula Lane project is located in northwest Harris County in the White Oak Bayou watershed, south of Cypress North Houston Road. Dula Lane consists of roadside ditches that drains into the Bernadine Estates detention ponds. The scope and proposed improvements are to regrade roadside ditches and reconstruct roadways along Dula Lane. Improvements will comply with Harris County standards.
This public meeting will act as an open forum to the members of the Bernadine Estates and Dula Lane neighborhoods on both projects' improvements and status.
Expected Impact:
This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation...
Click here for full text