Title: Request for approval of an agreement with Magellan Pipeline Company, L.P., in the amount of $39,430, for a project which includes crossing the pipeline with construction equipment and removal and replacement of concrete channel side slopes in the vicinity of the pipeline. (Armand Bayou Watershed, Project ID B104-03-02.1-X008, Agreement No. 2022-52, Precinct 2).
Attachments: 1. 21-6362 AGMT MAGELLAN 2022-52 PCT 2 backup
Department: Flood Control District
Department Head/Elected Official: Alan R. Black, P.E., Interim Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): B104-03-02.1-X008
Vendor/Entity Legal Name (if applicable): Magellan Pipeline Company, L.P.
MWDBE Participation (if applicable): N/A

Request Summary (Agenda Caption):
title
Request for approval of an agreement with Magellan Pipeline Company, L.P., in the amount of $39,430, for a project which includes crossing the pipeline with construction equipment and removal and replacement of concrete channel side slopes in the vicinity of the pipeline. (Armand Bayou Watershed, Project ID B104-03-02.1-X008, Agreement No. 2022-52, Precinct 2).
end

Background and Discussion:
The District requires an agreement by and between the District and Magellan Pipeline Company, L.P., allowing the District to cross the pipeline with construction equipment. Also, to remove and replace the concrete side slope through which the pipeline presently penetrates through as an aerial crossing over the channel.

Expected Impact:
The project will repair and stabilize the channel side slopes preventing further failure of the concrete side slopes in the vicinity of the Magellan pipeline. If an agreement is not obtained, repair of the concrete channel side slopes will not occur and the degrading soil behind the concrete side slopes will continue to fail resulting in the complete collapse of the channel side slopes.

Alternative Options:
Do not proceed with obtaining an agreement and repair of the channel. The channel will continue to deteriorate causing more impacts to the channel and surrounding property.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any): N/A
Date
Agenda Item #
Action Taken





Location: Intersection of ...

Click here for full text