File #: 21-6360    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/15/2021 In control: Commissioners Court
On agenda: 11/30/2021 Final action: 11/30/2021
Title: Request for approval of an amendment to an agreement with Gauge Engineering, LLC, in the amount of $300,000, to provide an additional analysis on HCFCD Unit G112-00-00. (San Jacinto River Watershed, Bond ID CI-60, Project ID G112-00-00-P001, Agreement No. 2020-164, Precincts 1 and 2).
Attachments: 1. 21-6360 AGMT GAUGE 2020-164 PCT 1,2 backup
Department: Flood Control District
Department Head/Elected Official: Alan R. Black, P.E., Interim Executive Director

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): G112-00-00-P001
Vendor/Entity Legal Name (if applicable): Gauge Engineering, LLC
MWDBE Participation (if applicable): Yes

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Gauge Engineering, LLC, in the amount of $300,000, to provide an additional analysis on HCFCD Unit G112-00-00. (San Jacinto River Watershed, Bond ID CI-60, Project ID G112-00-00-P001, Agreement No. 2020-164, Precincts 1 and 2).
end

Background and Discussion:
This project has two main priorities, to evaluate erosion concerns and recommend solutions and to evaluate flooding concerns and recommend solutions. Additional analysis is required to modify the flood reduction recommendations so that they are self-mitigating and constructible without added detention. The detention site that was considered is not attainable and, due to dense development of the area, other detention sites are also unlikely.

Expected Impact:
The goal of the additional analysis is to ensure that a recommendation is provided that is fully constructible without added detention. If future detention does become available, this recommendation is expected to pair well with that option and its flood reduction benefit is expected to increase.

Alternative Options:
Without the additional analysis, this study will have erosion recommendations that have already moved into the next phase for further consideration, but it will not have a flood reduction recommendation to send to Preliminary Engineering.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
04/07/2020
2.a.2
Agreement...