Title: Request for approval of a change in contract with A Status Construction in connection with El Dorado Boulevard (Road Construction), adding 11 calendar days, with an addition in the amount of $106,212.22, Job No. 19/0348-8, UPIN 17102MF0PM01, Precinct 2.
Attachments: 1. 21-6322 CIC - El Dorado Blvd P2.pdf
Department: County Engineer
Department Head/Elected Official: Loyd Smith, P.E., Interim County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 19/0348
Vendor/Entity Legal Name (if applicable): A Status Construction
MWDBE Participation (if applicable): N/A

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with A Status Construction in connection with El Dorado Boulevard (Road Construction), adding 11 calendar days, with an addition in the amount of $106,212.22, Job No. 19/0348-8, UPIN 17102MF0PM01, Precinct 2.
end

Background and Discussion:
Project includes build out of the second half of the boulevard section of existing El Dorado Blvd from approximately 250' north of Woodbourne Dr. north to Clear Lake City Blvd. Change includes adding removal/replacement of pipe, connection of pipe to existing manhole, 2 new inlets and concrete pavement. Change also includes increase in number of bollards. Days include time to complete the Phase 2 work.


Expected Impact:
Change allows work that was originally scheduled to be completed in El Dorado Phase 2 to be completed in Phase 1. This will eliminate the need for additional road closures and re-work in Phase 2. Change for increase in number of bollards is to compensate the contractor for the additional bollards shown to be installed in the contract plans.

Alternative Options:
Keep the Phase 2 work in Phase 2 and reduce the number of bollards from what's shown in the plans.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
x Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken
12/17/2019
23.d.13.b
Contract Award
07/28/2020
1.h.3
Contract Amendment for additional funds and extension of project term
09/15/2020
1.o.5
Contract Amendment for extension of project term
09/29/2020
1...