Title: Request for approval of an award on the basis of low bid to AAA Asphalt Paving Inc. in the amount of $1,691,471 for repaving of various roads in the Mossy Oaks Subdivision in Precinct 3, subject to applicable bonds to be received (210276).
Attachments: 1. 21-6303 for Job No. 210276.pdf
Department: Purchasing
Department Head/Elected Official: DeWight Dopslauf

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 21/0276
Vendor/Entity Legal Name (if applicable):
MWDBE Participation (if applicable):

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to AAA Asphalt Paving Inc. in the amount of $1,691,471 for repaving of various roads in the Mossy Oaks Subdivision in Precinct 3, subject to applicable bonds to be received (210276).
end

Background and Discussion:
The pavement improvement project aims to reconstruct the existing roadway network within the Mossy Oaks Subdivision to reflect Harris County Standards. Currently, the roadways vary in width but are all 20 feet wide or less and have a substandard cross slope. Once completed, all streets, totaling approximately 6,550 feet, will be rebuilt as 20 feet wide and have a 2% cross slope.

This project will take place along Marcia Drive, Beverly Drive, Kelly Drive, and Cathy Drive and reconstruct all remaining asphalt driveways not part of the ongoing 2016 CDBG-DR funded drainage improvements up to the ROW edge. Any driveway not currently meeting standards (either dirt or gravel) will be upgraded to asphalt or concrete and will connect into the improved roadway.

Expected Impact:
Improving the roadways will ensure reliable and safe transportation and efficient movement of people for nearby communities and residents.

Alternative Options:
Alternative option includes choosing not to improve the noted roadways in the project.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service

Prior Court Action (if any):
Date
Agenda Item #
Action Taken





Location:
Address (if applicable):
Precinct(s): Choose an item.


Fiscal and Personnel Summary
Service Name
-
FY 21-22
Estimates



FY 22
N...