Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): UPIN 19104MF13Z01 - Job No. 22/0009
Vendor/Entity Legal Name (if applicable): Aranda Industries LLC
MWDBE Contracted Goal (if applicable): 17%
MWDBE Current Participation (if applicable): 17%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Aranda Industries LLC in connection with Foxwood Subdivision Drainage Improvements - 2018, with an addition in the amount of $9,241.10, and Job No. 22/0009-1, UPIN 19104MF13Z01, Precinct 3, MWDBE Contracted Goal: 17%, MWDBE Participation Goal: 17%.
end
Background and Discussion:
This project is located approximately 0.7 miles north from FM 1960 Road E, east of Cypresswood Drive, and west of Lee Road. The scope of this project includes the addition of new inlets, new storm sewer, upsizing storm sewer, the relocation of conflicting utilities, the replacement of affected sidewalk, driveways, concrete pavement, and curbs at two locations within the Foxwood Subdivision to the Harris County standards.
The Change in contract request includes new items for the following:
* PCO - 1 Relocation of Existing Utilities - Added New Item "Relocation of Existing Utilities (8" Waterline & Fire Hydrant)" - additional cost for the amount $5,105.10 and added 0 days. The contractor, Aranda Industries LLC, located and exposed the existing utilities in preparation for the relocation. Upon learning Hunter Glen's MUD (MOC - Municipal Operations & Consulting Inc.) would be assuming responsibility for the fire hydrant relocation, the contractor backfilled the excavated area.
* PCO - 2 B-B Inlet Grates - Added New Item "Install B-B Inlet Grates at Existing Inlet" - additional cost for the amount $3,13...