Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 24103MF3E801
Vendor/Entity Legal Name (if applicable): GFT, Inc.
MWBE Contracted Goal (if applicable): 16.09%
MWBE Current Participation (if applicable): 51.85%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with GFT, Inc. in an amount of $410,560.80 for professional engineering services to conduct Design Phase Services for Subdivision Improvements - Arcadian Gardens Phase 1, UPIN 24103MF3E801, Precinct 3, MWBE Contracted Goal: 16.09%, MWBE Current Participation: 51.85%.
end
Background and Discussion:
The Arcadian Gardens area is an older subdivision with 18-ft to 20-ft wide road pavement and ditches along both sides of the roadway. The existing right of way is generally 60-ft in width. The precinct plans to create a multi-phase approach to remove roadside ditches and construct 5-ft wide sidewalks by installing storm-sewer system. The intent of this project is to conduct a comprehensive drainage analysis, environmental and geotechnical study followed by design and construction phases that Precinct can fund through grant programs.
Expected Impact:
The proposed project will guide the phased replacement of roadside ditches with storm-sewer system and construct 5-ft wide sidewalks. This project seeks to enhance pedestrian safety and provide drainage improvements within the project limit. It will support grant funding efforts a...
Click here for full text