Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): E500-25-00-E002
Vendor/Entity Legal Name (if applicable): Sprint Sand & Clay LLC
MWBE Contracted Goal (if applicable): 29.87%
MWBE Current Participation (if applicable): 22.63%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 1 with Sprint Sand & Clay LLC, for the Arbor Oaks Stormwater Detention Basin CDBG-DR Project (White Oak Bayou Watershed, Bond ID C-15, Project ID E500-25-00-E002, Job No. 25/0110, Precinct 1, MWBE Contracted Goal: 29.87%, MWBE Current Participation: 22.63%).
end
Background and Discussion:
The project is a proposed regional stormwater detention basin to be constructed on the site of the former Arbor Oaks Subdivision near the confluence of White Oak Bayou (E100-00-00) and Vogel Creek (E121-00-00). This project will create stormwater detention volume within the White Oak Bayou watershed. The purpose of this change order is to increase pay items for inlet removal and sanitary sewer pipe.
Expected Impact:
The Arbor Oaks Detention Basins encompass 69.9 acres in size and are anticipated to generate approximately 431 acre-feet of flood storage detention volume providing flood mitigation and flood damage reduction benefits to Harris County residents.
Alternative Options:
Alternatives to authorizing this amendment include canceling the existing contract and seeking additional services to complete the necessary work or removing the work from the scope of the project. These options would cre...