Legislation Details

File #: 26-5434    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/11/2026 In control: Commissioners Court
On agenda: 8/25/2026 Final action: 8/25/2026
Title: Request for approval of an amendment to an interlocal agreement with Stephen F. Austin State University to study the impact of tree planting on water infiltration and stormwater reduction within flood control stormwater detention basins to determine the potential benefits to planting trees as a green stormwater infrastructure tool (Project ID Z100-00-00-V262, Agreement No. 2022-125, Countywide).
Attachments: 1. 082526 AMEND SFA UNIV 2022-125 CW backup.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Z100-00-00-V262
Vendor/Entity Legal Name (if applicable): Stephen F. Austin State University

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an interlocal agreement with Stephen F. Austin State University to study the impact of tree planting on water infiltration and stormwater reduction within flood control stormwater detention basins to determine the potential benefits to planting trees as a green stormwater infrastructure tool (Project ID Z100-00-00-V262, Agreement No. 2022-125, Countywide).
end

Background and Discussion:
This amendment will provide extend the interlocal agreement by one additional year, at no additional cost. The time extension will allow for additional research on the impact of tree planting in detention basins on water infiltration. This amendment is needed to complete on-going research and continue measurement of soil infiltration in key stormwater detention basin sites.

Expected Impact:
This agreement will measure the impact of forest establishment in reducing stormwater runoff and increasing stormwater infiltration. The Flood Control District will use the data and Study results to model the impact of forest establishment on stormwater management over time to guide the Flood Control District in planning projects.

Alternative Options:
The alternative to approving this item would be to limit the study ...

Click here for full text