Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable):
Vendor/Entity Legal Name (if applicable): San Jacinto River Authority
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a temporary right of entry with San Jacinto River Authority, to gain access to conduct work on a detention basin project along Jackson Bayou (Jackson Bayou Watershed, Bond ID F-107, Project ID R500-01-00-E001, Agreement No. 2026-28, Precinct 3).
end
Background and Discussion:
This agreement will provide temporary right-of-entry to the Flood Control District for construction of a stormwater detention basin along Jackson Bayou as part of the Flood Control District's CDBG-DR program. This project reduces flood risk in the Jackson Bayou watershed and does not adversely impact downstream water surface elevations, adjacent properties outside of the proposed project limits, or receiving drainage infrastructure. This project occurs in the 2nd quartile under the 2022 Prioritization Framework approved by Commissioners Court.
Expected Impact:
This agreement will provide temporary right-of-entry using property owned by the San Jacinto River Authority (SJRA) to the Flood Control District for construction of a stormwater detention basin.
Alternative Options:
The alternative to approving this item would be use the access from Runneburg Road on the south of the project area, which would result in additional traffic control m...
Click here for full text