File #: 26-3373    Version: 1 Name:
Type: Utility Agreement Status: Agenda Ready
File created: 5/18/2026 In control: Commissioners Court
On agenda: 5/28/2026 Final action: 5/28/2026
Title: Request for approval to execute a utility agreement with CenterPoint Energy Houston Electric, LLC, in the amount of $3,263, for streetlight rehabilitation (San Jacinto River Watershed, Bond ID F-14, Project ID G103-80-03.1-E002, Agreement No. 2026-08, Precinct 3).
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): G103-80-03.1-E002
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a utility agreement with CenterPoint Energy Houston Electric, LLC, in the amount of $3,263, for streetlight rehabilitation (San Jacinto River Watershed, Bond ID F-14, Project ID G103-80-03.1-E002, Agreement No. 2026-08, Precinct 3).
end

Background and Discussion:
This utility agreement will allow the relocation of the streetlight conduit to protect it from being exposed by lowering the channel flowline for G103-80-03.1-E002 Taylor Gully Channel Improvements. The Taylor Gully channel flows west to east, bordering Montgomery County in the northwest and running eastward toward Mills Branch and Caney Creek in Harris County. The proposed project alternative would feature a partially concrete lined channel from the existing drop structure to downstream of Creek Manor Drive, the replacement of the existing culverts on Rustling Elms Drive and a stormwater detention basin.

Expected Impact:
Remove the conduit between streetlight 715337 and 715338 and install conduit between 715350 and 366387.

Alternative Options:
If no action is taken, flood risks will remain the same.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maint...