Title: Request for approval to execute a joint participation interlocal agreement with Harris County Municipal Utility District No. 365/364 for environmental studies and design of the future expansion of an existing drainage basin in and around Coles Crossing within the Cypress Creek Watershed, UPIN 26103M2BUB01, Precinct 3.
Sponsors: Mony Hossain
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): UPIN 26103M2BUB01
Vendor/Entity Legal Name (if applicable): Harris County Municipal Utility District No. 365/364

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a joint participation interlocal agreement with Harris County Municipal Utility District No. 365/364 for environmental studies and design of the future expansion of an existing drainage basin in and around Coles Crossing within the Cypress Creek Watershed, UPIN 26103M2BUB01, Precinct 3.
end

Background and Discussion:
The detention expansion is in response to address homes being flooded in the Tax Day Flood and in Hurricane Harvey.

Expected Impact:
In response to those flood events, the districts developed a plan to expand the SWDB from a dry-bottom to a wet-bottom facility thereby increasing the capacity by as much as 200 acre-feet.

Alternative Options:
Failure to do this will result in further flooding in the community.




County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Econo...