Title: Request for approval to execute a Service Outlet Location Statement for Installation of a Pole and transformer to energize the new upcoming trail lighting for Pedestrians, for Connectivity Project - Deussen-Eisenhower, UPIN 22101MF2F801, Precinct 1.
Attachments: 1. 25-4217-UA-UPIN 22101MF2F801-CenterPoint Energy-Connectivity Project-Deussen-Eisenhower
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 22101MF2F801
Vendor/Entity Legal Name (if applicable): CenterPoint Energy

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for Installation of a Pole and transformer to energize the new upcoming trail lighting for Pedestrians, for Connectivity Project - Deussen-Eisenhower, UPIN 22101MF2F801, Precinct 1.
end

Background and Discussion:
The project is to construct waterfront structures, pedestrian bridges, parking lot, boardwalk, trail, parking lot, lighting and landscape in both Alexander Deussen and Dwight D. Eisenhower Parks. The Service Outlet Location is needed for Installation of pole and Transformer which serves the upcoming trail lighting for the Pedestrians within Deussen Park improvement area.

Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy, to Install 120/240V, which serves the upcoming proposed trail lighting.

Alternative Options:
No alternative options.




County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
...

Click here for full text