Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 202 Hamblen Rd, Kingwood, Texas 77339 for electrical power serving Edgewater Park, including all deposit/fees for utility services, UPIN 23103MF2VZ01, Precinct 3.
Attachments: 1. 25-4215-SOLS-UPIN 23103MF2VZ01-CenterPoint Energy-Edgewater Park-202 Hamblen-P3
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Choose an item.
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 23103MF2VZ01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

MWBE Contracted Goal (if applicable):
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 202 Hamblen Rd, Kingwood, Texas 77339 for electrical power serving Edgewater Park, including all deposit/fees for utility services, UPIN 23103MF2VZ01, Precinct 3.
end

Background and Discussion:

Edgewater Park is a park project which will bring features and amenities to the park that include a boat ramp, parking lots, access roads, prefabricated restrooms with six stalls each, a playground, hike and bike trails throughout the park, detention ponds, a pedestrian bridge over a wetland pond, and a fishing pier.


Expected Impact:

Approval of the service outlet location statement will allow CenterPoint Energy to establish electrical service to Edgewater Park, which is needed to enhance the operations of the park.



Alternative Options:

If the SOLS is not approved, no power will be provided to the park which will impact the day-to-day operations of the park and increase delay of construction.