Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: Not applicable
Regular or Supplemental RCA: Regular RCA
Type of Request: Asset Management
Project ID (if applicable): 22101MF2F801
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC
MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval for County of Harris, a body corporate and politic under the laws of the State of Texas, to convey real estate to CenterPoint Energy Houston Electric, LLC, tract 1, a 0.1014-acre utility easement for Connectivity Project - Deussen-Eisenhower - 2021 project and that the County Judge execute the utility easement, UPIN 22101MF2F801, Precinct 1.
end
Background and Discussion:
The project is to construct waterfront structures, parking lot, boardwalk, trail, lighting and landscape in both Alexander Deussen and Dwight D. Eisenhower Parks. It also includes the construction of a two span, signature pedestrian bridge with parapet panel over West Canal at Aqueduct Road to provide the pedestrian, hike and bike connection between Deussen Park and Eisenhower Park as part of the park trail system. The West Canal pedestrian bridge construction requires CenterPoint Energy to relocate the power poles within Deussen Park for both construction and permanent conditions. These conflict power poles are within the existing utility easement.
Expected Impact:
This action will resolve the conflict condition and provide safe zone during the construction.
Alterna...