Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): P130-02-00-X017
Vendor/Entity Legal Name (if applicable): Solid Bridge Construction, LLC
MWBE Contracted Goal (if applicable): 31%
MWBE Current Participation (if applicable): 25.82%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 4 with Solid Bridge Construction, LLC, for the Channel Repair along P130-02-00, adding 180 calendar days (Greens Bayou Watershed, Bond ID Z-02, Project ID P130-02-00-X017, Job No. 23/0176, Precinct 3, MWBE Contracted Goal: 31%, MWBE Current Participation: 25.82%).
end
Background and Discussion:
This change in contract is needed to complete the construction contract for this project. Channel Repair along P130-02-00 includes the channel erosion repair and restoration of the side slopes of P130-02-00 from approximately 1,000 linear feet south of Woodland Hills Drive to Rankin Road. The scope of work involves tree removal as shown in the plans, backslope swale system repair and installation, desilting of the existing channel in areas where there is concrete slope paving on the side slopes and transitions as required, and repair of side slopes and sinkholes as indicated. The purpose of this contract change is to increase quantities necessary to complete construction and increase project duration. The contract change includes the addition of 180 days due to inclement weather and new alternative access route and includes extending existing bid items for construction fenc...