Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0121, UPIN 23103MF2YA01
Vendor/Entity Legal Name (if applicable): GLM Contracting, Inc.
MWBE Contracted Goal (if applicable): 29%
MWBE Current Participation (if applicable): 51.60%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with GLM Contracting, Inc., in connection with On-Call - Construction of Sidewalks and Related Items for Harris County Precinct 3 - 2023, with no change in the amount, Job No. 23/0121-1, UPIN 23103MF2YA01, Precinct 3, MWBE Contracted Goal: 29%, MWBE Current Participation: 51.60%.
end
Background and Discussion:
This project is for On-call Construction contract for sidewalks throughout Precinct 3. The services requested in this change order is part of extra work that was not included in the original bid items. Since this is a term contract, no increase to the contract value is necessary and it is not expected to surpass the 25% threshold. However, a change in contract is needed to capture the new bid items.
To accommodate this request within the current contract, new bid items are required. The new bid item is only to establish the unit price and there is no change to the contract amount.
On-Call Maintenance - Construction of Sidewalks and Related Items - 2023 - 23/0121 - PCO-22.
Change includes adding bid Item# 100 missing in original bid items.
4" PVC Pipe - $1,536.200/LS
Catch Basin - $400 EACH
Expected Impact:
Change allows the contract...