Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0239, UPIN 18103N302203
Vendor/Entity Legal Name (if applicable): Sequeira Civil Construction, LLC
MWBE Contracted Goal (if applicable): 32%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with final construction of Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road, adding 8 calendar days, with a deduction in the amount of $475,913.57, Job No. 23/0239-3, UPIN 18103N302203, Precinct 3, MWBE Contracted Goal: 32%, MWBE Current Participation: 100%.
end
Background and Discussion:
Project included the reconstruction of Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road. Reconstruction includes an upgrade of the roadway from a two-lane asphalt road with open ditches to a 4-lane concrete curb and gutter boulevard with a 32' raised median.
The change in contract includes the following:
* Install Sign $765.00
* Install Flag and Flags Bracket $2,209.90
* Install Temporary Post $1,035.32
* Remove and Replace School Zone Speed Signs $3,397.00
* The final adjustment (reconciliation of actual quantities used in construction against the bid quantities). (-$475,913.57).
Expected Impact:
Change allows unused funds to be returned to Harris County and allows the Contractor to be compensated.
Alternative Options:
Maintain the...