File #: 25-3373    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 5/27/2025 In control: Commissioners Court
On agenda: 6/12/2025 Final action:
Title: Request for approval of a change in contract with ECON Development, Inc. for General Earthen and Concrete Channel Repairs (Countywide) for the Flood Control District, resulting in an addition of $80,100 to the contract amount (250014), MWBE Contracted Goal: 19.69%.
Attachments: 1. 25-3373 Job No. 250014 Change in Contract - ECON Development, Inc..pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): 250014
Vendor/Entity Legal Name (if applicable): ECON Development, Inc.

MWBE Contracted Goal (if applicable): 19.69%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with ECON Development, Inc. for General Earthen and Concrete Channel Repairs (Countywide) for the Flood Control District, resulting in an addition of $80,100 to the contract amount (250014), MWBE Contracted Goal: 19.69%.
end

Background and Discussion:
The Contract consists of project work orders that will be issued to the Contract for execution. Project work orders will include general earthen and concrete repairs, for projects located in Harris County, Texas. Major emphasis of the project work order will be larger earthen slope failures and concrete channel lining repairs throughout the District, to include the mainstems of the Federal Sections (U.S. Corps of Engineers), and the HCFCD channel sections. This work will include but not be limited to full concrete panel replacement, concrete lining repairs - partial depth with engineered ductal mortar (EDM), headwall/wingwalls repairs with EDM, disposal of sediment accumulations on concrete lined channels, filling voids behind concrete channel lining, light erosion repair with granular 3" X 5" fill and riprap installation, earthen slope failure, earthen toe failure, sinkholes, outfall pipe removal and replacement, inlet structure removal and replacement, sma...