Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 250014
Vendor/Entity Legal Name (if applicable): ECON Development, Inc.
MWBE Contracted Goal (if applicable): 19.69%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with ECON Development, Inc. for General Earthen and Concrete Channel Repairs (Countywide) for the Flood Control District, resulting in an addition of $80,100 to the contract amount (250014), MWBE Contracted Goal: 19.69%.
end
Background and Discussion:
The Contract consists of project work orders that will be issued to the Contract for execution. Project work orders will include general earthen and concrete repairs, for projects located in Harris County, Texas. Major emphasis of the project work order will be larger earthen slope failures and concrete channel lining repairs throughout the District, to include the mainstems of the Federal Sections (U.S. Corps of Engineers), and the HCFCD channel sections. This work will include but not be limited to full concrete panel replacement, concrete lining repairs - partial depth with engineered ductal mortar (EDM), headwall/wingwalls repairs with EDM, disposal of sediment accumulations on concrete lined channels, filling voids behind concrete channel lining, light erosion repair with granular 3" X 5" fill and riprap installation, earthen slope failure, earthen toe failure, sinkholes, outfall pipe removal and replacement, inlet structure removal and replacement, sma...
Click here for full text