Title: Request for approval of a change in contract with Serco Construction Group, Ltd., in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements-2018, with a deduction in the amount of $7,624,308.87, Job No. 23/0042-4, UPIN 19102MF15W01, Precinct 2, MWBE Contracted Goal: 26%, MWBE Current Participation: 100%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 23/0042, UPIN 19102MF15W01
Vendor/Entity Legal Name (if applicable): Serco Construction Group, Ltd.

MWBE Contracted Goal (if applicable): 26%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Serco Construction Group, Ltd., in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements-2018, with a deduction in the amount of $7,624,308.87, Job No. 23/0042-4, UPIN 19102MF15W01, Precinct 2, MWBE Contracted Goal: 26%, MWBE Current Participation: 100%.
end

Background and Discussion:
The Cedar Bayou Park East and West Subdivision Drainage Improvements project site consists of subdivision drainage improvements and stormwater detention basin located south of IH 10 from Sjolander Road to Bayou Boulevard, in east Harris County, discharging into HCFCD Channels Q113-00-00 and Q114-00-00. Major work activities include approximately 25,300 linear feet of reinforced concrete storm sewer consisting of various reinforced concrete pipe sizes, reinforced concrete box sizes, inlets, manholes, junction boxes, culvert headwall/wingwall structures, removal and reconstruction of existing driveways and proposed detention pond.

The change in contract includes the following:

Quantity Adjustment: The line items are adjusted to reconcile underrun quantities on the project for completion of the proposed scope of work.

? The decrease ...