Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): 23103MF2N101
Vendor/Entity Legal Name (if applicable): Gradient Group, LLC
MWDBE Contracted Goal (if applicable): 100%
MWDBE Current Participation (if applicable): 83%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of the Traffic and Pedestrian Study - Old Town Spring in Precinct 3, UPIN 23103MF2N101.
end
Background and Discussion:
The Traffic and Pedestrian Study - Old Town Spring evaluated on-street parking, sidewalks, shared-use paths, pedestrian and ADA ramps, crosswalks, signage, etc. Services also included evaluating existing emergency signal devices to determine if modifications or replacements were needed to improve public safety. A public outreach campaign was conducted with Precinct 3 to seek input from the Old Town Spring Improvement District (OTSID). The area included streets west of the Spring Cypress Road and Brandt Road intersection, Preston Avenue to the north, east of West Hardy Road, and south just past Spring School Road.
Expected Impact:
This study evaluated all roads within OTSID and provided recommendations for traffic and pedestrian improvements and/or safety. Recommendations allow for strategic implementation based on the data collected and outreach performed.
Alternative Options:
Without this study and recommendations, the Old Town Spring area would continue to feel the effects of a transportation and mobility infrastructure that does not meet the infrastructure and safety needs of the residents, businesses, and visitors.
Alignment with Goal(s):
X Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
X Governance and Customer Service
Prior Court Acti...
Click here for full text