File #: 25-2600    Version: 1 Name:
Type: Utility Agreement Status: Agenda Ready
File created: 4/22/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action:
Title: Request for approval to execute a Utility Agreement with 7-Green Services, LLC in connection with Pine Trails Subdivision Drainage Improvements- 2018, UPIN 19101MF14201, Precinct 2.
Attachments: 1. 25-2600-UA-UPIN 19101MF14202-Pine Trails 1-2-5-6-7Green-P2-v01.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): UPIN 19101MF14201
Vendor/Entity Legal Name (if applicable): 7-Green Services, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Utility Agreement with 7-Green Services, LLC in connection with Pine Trails Subdivision Drainage Improvements- 2018, UPIN 19101MF14201, Precinct 2.
end

Background and Discussion:
The Pine Trails Subdivision Drainage Improvements project is located in Northeast Harris County in Precinct 2. The scope of work for this utility agreement includes Harris County cutting, capping, and removing abandoned pipelines owned by 7Green in order to facilitate ditch restoration. This agreement allows Harris County to work within the easement and perform said work as necessary to complete the planned drainage improvements.

Expected Impact:
This project generally seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This utility agreement specifically will allow Harris County to remove obstacles and regrade the ditches to direct flow from the subdivision into the channel. No impact to project schedule or staffing anticipated.

Alternative Options:
Alternative options would include redesign of the project to avoid the pipelines or abandonment of the project.

County Strategic Plan Goal: 2. Connect our com...