Title: Request for approval to negotiate with Accelerate Engineering LLC to provide professional engineering services in connection with the design, survey, and construction of a rebuild traffic signal with pedestrian appurtenances at Alief Clodine Road at Metro Boulevard, UPIN 24035MF3H501, Precinct 4.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

Project ID (if applicable): 24035MF3H501
Vendor/Entity Legal Name (if applicable): Accelerate Engineering LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to negotiate with Accelerate Engineering LLC to provide professional engineering services in connection with the design, survey, and construction of a rebuild traffic signal with pedestrian appurtenances at Alief Clodine Road at Metro Boulevard, UPIN 24035MF3H501, Precinct 4.
end

Background and Discussion:
Traffic signals are re-built to improve the operation of an intersection and better facilitate pedestrian activities. The existing signal uses outdated and degrading equipment and does not adequately accommodate pedestrian crossings. Re-building this signal will ensure the intersection is brought up to compliance with current standards and will provide pedestrian connectivity.

Expected Impact:
Re-building the traffic signal will bring the infrastructure to current standards and specifications and reduce overall maintenance cost. It will also significantly reduce the risk of failure during a catastrophic event.

Alternative Options:
To continue to maintain the existing traffic signal and slowly replace degrading parts as they fail. This may potentially be more costly and incurs a risk of failure due to aging infrastructure.

County Strategic Plan Goal: 2. Connect our community with safe, reliabl...