Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Utility Agreement
Project ID (if applicable): 2412300004
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 18802 1/2 Copper Breaks Crossing, Cypress, Texas 77433 (intersection of Copper Breaks Crossing and Tuckerton Road) for electrical power serving a traffic signal, ePermits Project Number: 2412300004, Precinct 3.
end
Background and Discussion:
As part of the development in the area, a traffic impact analysis was conducted and submitted to Harris County Permits for review and approval. The aforementioned performed analysis warranted a traffic signal at the intersection of Copper Breaks Crossing and Tuckerton Road, which the developer committed to construct.
Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy Houston Electric, LLC to provide electrical service to the traffic signal, which is needed to enhance operations of the intersection of Copper Breaks Crossing and Tuckerton Road.
Alternative Options:
All Traffic Signals require a power source, which is typically obtained through CenterPoint Energy Houston Electric, LLC. Alternative options are to plac...