File #: 25-2734    Version: 1 Name:
Type: Utility Agreement Status: Agenda Ready
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action:
Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 3778 1/2 Fry Road, Katy Texas 77449 (Intersection of Fry Road and Westfield Pkwy Drive) for electrical power serving a traffic signal associated with Traffic Signal and Intersection Improvement Package - Fry Road Project, UPIN 23104MF2XH01, Precinct 4.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, Env. SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 23104MF2XH01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 3778 1/2 Fry Road, Katy Texas 77449 (Intersection of Fry Road and Westfield Pkwy Drive) for electrical power serving a traffic signal associated with Traffic Signal and Intersection Improvement Package - Fry Road Project, UPIN 23104MF2XH01, Precinct 4.
end

Background and Discussion:
Traffic signal warrants were performed for a traffic impact study as part of traffic improvement project on Fry Road, the analysis warranted a traffic signal at the intersection of Fry Road and Westfield Pkwy Drive. Currently the intersection is unsignalized and has stop sign control for minor street. The signal will be constructed under Traffic Signal and Intersection Improvement Package - Fry Road - 2023 - UPIN 23104MF2XH01, Precinct 4. Project.

Expected Impact:
The project will install a new traffic signal at the intersection with exclusive left turn lanes and extend the capacity of the existing left turn lanes along Fry Road, to safely handle the demands of the current and future traffic volumes. The improvements...