Skip to main content
Harris County Logo
File #: 25-2726    Version: 1 Name:
Type: Utility Agreement Status: Agenda Ready
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action:
Title: Request for approval to execute a Service Outlet Location Statement for Installation of electric Poles to avoid conflict with the proposed Harris County traffic signal Master pole at the Intersection of Imperial Valley Drive and Doubletree Glen Drive, UPIN 23101MF2XP01, Precinct 1.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 23101MF2XP01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for Installation of electric Poles to avoid conflict with the proposed Harris County traffic signal Master pole at the Intersection of Imperial Valley Drive and Doubletree Glen Drive, UPIN 23101MF2XP01, Precinct 1.
end

Background and Discussion:
Installing a new traffic signal at the intersection of Imperial Valley Drive and Doubletree Glen Drive is a project aimed at enhancing traffic flow at the existing intersection. The service outlet location statement is needed to Remove 55ft CenterPoint Electric Power Pole and Installation of 65ft Pole to avoid conflict from HC Proposed Master Pole for traffic signal lights.

Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy, to Install 65 Ft Electric polls, which is needed to avoid Conflict and enhance the operation of the intersection of Imperial Valley Drive and Doubletree Glen Drive.

Alternative Options:
No alternative options, the Poles must be raised to avoid conflict.



County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and re...

Click here for full text