Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Public Necessity
Project ID (if applicable): A100-00-00-R008
Vendor/Entity Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to decree that the Harris County Flood Control District project serves a public purpose and public necessity, which requires that the Harris County Real Property Division be directed to acquire 26 fee simple tracts for the public project known as Clear Creek Federal Flood Risk Management Project, for the purpose of channel improvements, authorizing eminent domain if necessary (Clear Creek Watershed, Bond ID C-03, Project ID A100-00-00-R008, Precinct 1).
end
Background and Discussion:
These properties are located within the proposed project limits for the Clear Creek Federal Flood Risk Management Project, which is a partnership project with the U.S. Army Corps of Engineers. These properties were originally identified for use under the 2012 General Reevaluation Report (GRR) plan approved by the USACE, and the revised Preliminary Engineering and Design (PED) plan that is currently undergoing Post Authorization Change Report (PACR) process for approval of project description change. Design adjustments to preliminary concepts from the GRR are based on newer field conditions and fall within the approval limits provided by the approved EIS that was published with the 2012 GRR.
Expected Impact:
Flood Risk Reduction for Clear Creek w...