Title: Request for approval of change in contract No. 2 with Liberty Construction Group, Inc., for the Addicks Watershed Repair Package 2, adding 48 calendar days (Project ID Z100-00-00-X323, Bond ID F-53, Job No. 23/0116, Precinct 4, MWBE Contracted Goal: 31%, MWBE Current Participation: 40.36%).
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Z100-00-00-X323
Vendor/Entity Legal Name (if applicable): Liberty Construction Group, Inc.

MWBE Contracted Goal (if applicable): 31%
MWBE Current Participation (if applicable): 40.36%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 2 with Liberty Construction Group, Inc., for the Addicks Watershed Repair Package 2, adding 48 calendar days (Project ID Z100-00-00-X323, Bond ID F-53, Job No. 23/0116, Precinct 4, MWBE Contracted Goal: 31%, MWBE Current Participation: 40.36%).
end

Background and Discussion:
This change in contract is needed to complete the construction contract for this project. Project Z100-00-00- X323 represents a combination of construction activities of three different Project IDs located in the Addicks Reservoir (U) Watershed in Harris County, Texas. The objective of this Project is to repair failures within the project limits. Repairs include, but are not limited to, installing rock, rebuilding side slopes, replacing inlet structures and storm outfalls, removing sediment, and replacing concrete channel lining. The purpose of this contract change is to add 41 inclement weather days and 7 days for contractor delays.

Expected Impact:
This change will allow the contractor to construct the project so that Harris County can realize intended flood risk reduction benefits.

Alternative Options:
This is an active construction contract, so there are not many alternatives to a...