Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 23103MF2VZ01
Vendor/Entity Legal Name (if applicable): Quiddity Engineering, LLC
MWBE Contracted Goal (if applicable): 20%
MWBE Current Participation (if applicable): 46.19%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Quiddity Engineering, LLC, in the amount of $68,236.00 for professional engineering services to provide improvements to Edgewater Park, UPIN 23103MF2VZ01, Precinct 3, MWBE Contracted Goal: 20%, MWBE Current Participation: 46.19%.
end
Background and Discussion:
Additional Professional Engineering Services needed (design, engineering, and other pre-construction activities) to move forward with additional park features to include a boat ramp, parking lots, access roads, prefabricated restrooms with six stalls each, a playground, hike and bike trails throughout the park, detention ponds, a pedestrian bridge over a wetland pond, and a fishing pier as requested by Precinct 3.
Expected Impact:
To help maintain the current project schedule and to allow for design phase to proceed.
Alternative Options:
If this request with Quiddity Engineering, LLC is not approved, the project will not be able to proceed with required additional design work and impact improvements to the park.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: I: Increase acc...