File #: 25-2686    Version: 1 Name:
Type: Financial Authorization Status: Agenda Ready
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action:
Title: Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as Boudreaux Road Segment 3 - from Old Boudreaux Road to 300' west of Hufsmith-Kohrville Road - 2019, tract numbers 6 & 7, for $50,955.00 which is $6,175.00 over the appraised value, UPIN 20104MF1C401, Precinct 3.
Attachments: 1. 25-2686-(Financial Authorization)-20104MF1C401-BoudreauxSeg3 Trs.6&7 Increase-P-050825
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: Not Applicable

Regular or Supplemental RCA: Regular RCA

Type of Request: Financial Authorization

Project ID (if applicable): 20104MF1C401
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

MWBE Contracted Goal (if applicable): Not Applicable
MWBE Current Participation (if applicable): Not Applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): Not Applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as Boudreaux Road Segment 3 - from Old Boudreaux Road to 300' west of Hufsmith-Kohrville Road - 2019, tract numbers 6 & 7, for $50,955.00 which is $6,175.00 over the appraised value, UPIN 20104MF1C401, Precinct 3.
end

Background and Discussion:
This project aims to design a four-lane concrete boulevard with a 32-foot raised median, underground storm sewer system, and pedestrian sidewalk within a 100-foot ROW, transitioning from an existing 14-foot median near Old Boudreaux Road. It includes strategic drainage solutions, intersection improvements, and right-of-way verifications, enhancing safety and integrating with ongoing infrastructure projects.

Expected Impact:
The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved drainage and pedestrian facilities. It will reduce congestion, accommodate future growth, and integrate seamlessly with surrounding projects, contributing to the overall development and sustainability of t...