Title: Request for approval to execute an agreement with Geotest Engineering, Inc. in the amount of $478,114.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Cypress Creek Estates Subdivision Drainage Improvements - 2018, UPIN 19103MF14401, Precinct 3, MWBE Contracted Goal: 100%.
Attachments: 1. 25-2677-(Award)- 19103MF14401-Geotest Engineering Inc.-Cypress Creek Estates Drainage Improvements-P3
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer


Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 19103MF14401; Job No. 24/0448
Vendor/Entity Legal Name (if applicable): Geotest Engineering, Inc.

MWBE Contracted Goal (if applicable): 100% - MBE/HUB/DBE
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Geotest Engineering, Inc. in the amount of $478,114.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Cypress Creek Estates Subdivision Drainage Improvements - 2018, UPIN 19103MF14401, Precinct 3, MWBE Contracted Goal: 100%.
end

Background and Discussion:

This project is located in Northwest Harris County in both the White Oak Bayou and Cypress Creek watersheds. It is west of N. Eldridge Parkway and north of Cypress North Houston Road. The drainage system is currently roadside ditches. The proposed improvements are to regrade the roadside ditches, install a storm sewer system below the ditches, and connect to the K500-01-00 detention basin expansion project for mitigation on this project.

Expected Impact:

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material's compliance with Harris County Engineering Department's adopted standards and specifications as required by state law.

Alternative Options:

Construction materials testing is required by state law. Thus...