Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Asset Management
Project ID (if applicable): 21090MF1YS01
Vendor/Entity Legal Name (if applicable): City of LaPorte, Texas, a municipal corporation
MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval for Harris County Flood Control District, a political subdivision of the State of Texas to accept a real estate conveyance of a 0.1118 acre drainage easement from the City of LaPorte, Texas, a municipal corporation, tract B512-02-00-00-002.0 for B512-00-00 and Tributaries Conveyance Improvements for the Brookglen Area - B512-02-00-E001 project, UPIN 21090MF1YS01, Precinct 2.
end
Background and Discussion:
The Brookglen Stormwater Detention Basin Phase 2 project is located in Harris County Pct. 2 and within the City of La Porte limits. For Phase 2, the proposed south compartment is bounded by B112-00-00 to the west, Ashwyne Lane to the north, CenterPoint Energy Electric's property with high voltage transmission facilities to the east, and a transmission line easement to the south. Based on community feedback, the south compartment is being designed with multiple stormwater detention basin cells to avoid the abandonment of Gladwyne Lane. Gladwyne Lane will remain open during construction to maintain the traffic flow within the Brookglen Subdivision. Both stormwater detention basin sites ha...