File #: 25-2658    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action:
Title: Request for approval of a second amendment to the agreement with Harris County Precinct 3 to reallocate $80,592.00 from Design to Construction to adequately cover the cost of construction for the Barrett Station Drainage Improvements project.
Attachments: 1. Barrett Station_Amendment2_PCT3
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Housing and Community Development
Primary Department Head/Elected Official: Thao Costis, Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment

Project ID (if applicable): D2017-016 Barrett Station Drainage Improvements Project
Vendor/Entity Legal Name (if applicable): Harris County PCT 3

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a second amendment to the agreement with Harris County Precinct 3 to reallocate $80,592.00 from Design to Construction to adequately cover the cost of construction for the Barrett Station Drainage Improvements project.
end

Background and Discussion:
To increase drainage system conveyance and capacity approximately 3,000 LF of existing roadside ditches and upsizing driveway crossing culvert and constructing approximately 4,360 LF of roadside ditches and multi-use detention basins. These activities shall benefit 275 persons of which 212 are low to moderate-income with drainage improvements. Project area is in Precinct 3.

Expected Impact:
To increase drainage and construct detention basin to reduce existing and future flooding levels generally bound in on the North by E/W Broussard, South by 1942, East by Parris, and West by Crosby-Lynchburg/ Beaumont Hwy, San Jacinto River watershed. No fiscal impact.

Alternative Options:
N/A

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, fl...

Click here for full text