Title: Request for approval of an agreement with Agha Engineering, LLC, in the amount of $1,061,533.65, to provide preliminary engineering services in support of channel conveyance improvements and a stormwater detention basin on HCFCD Unit H125-00-00 (Hunting Bayou Watershed, Bond ID F-17, Project ID H125-00-00-E001, Agreement No. 2024-32, Precincts 1 and 2, MWBE Contracted Goal: 19.6%).
Attachments: 1. 041025 AGMT AGHA 2024-32 PCT 1 AND 2 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): H125-00-00-E001
Vendor/Entity Legal Name (if applicable): Agha Engineering, LLC

MWBE Contracted Goal (if applicable): 19.6%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an agreement with Agha Engineering, LLC, in the amount of $1,061,533.65, to provide preliminary engineering services in support of channel conveyance improvements and a stormwater detention basin on HCFCD Unit H125-00-00 (Hunting Bayou Watershed, Bond ID F-17, Project ID H125-00-00-E001, Agreement No. 2024-32, Precincts 1 and 2, MWBE Contracted Goal: 19.6%).
end

Background and Discussion:
This agreement will provide preliminary engineering report for the support of Right-of-Way Acquisition, Design and Construction of Wallisville Outfall. The preliminary engineering report will include hydraulic analysis for three alternatives for stormwater detention basin and channel improvements, and to evaluate the costs and benefits of each alternative, and to make recommendation of most feasible alternative. The project area is located at the Hunting Bayou Watershed along the channel H125-00-00, just north of the intersection of I-10E and I-610. This project is funded by the 2018 bond program, charter ID F-17. This project occurs in the 3rd quartile under the 2022 Prioritization Framework approved by Commissioners Court.

Expected Impact:
The project seeks to reduce flood risks and strengthen resiliency in the...