File #: 25-2420    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 4/4/2025 In control: Commissioners Court
On agenda: 4/16/2025 Final action: 4/16/2025
Title: Request for approval on the basis of highest overall evaluation and authorize negotiations with Resalire Infrastructure Solutions LLC for professional engineering/architectural services to provide a feasibility study and site plan of Winfield Basin in the Greens Bayou Watershed for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240416), MWBE Contracted Goal: 18.86%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

Project ID (if applicable): 240416
Vendor/Entity Legal Name (if applicable): Resalire Infrastructure Solutions LLC

MWBE Contracted Goal (if applicable): 18.86%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS

Request Summary (Agenda Caption):
title
Request for approval on the basis of highest overall evaluation and authorize negotiations with Resalire Infrastructure Solutions LLC for professional engineering/architectural services to provide a feasibility study and site plan of Winfield Basin in the Greens Bayou Watershed for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240416), MWBE Contracted Goal: 18.86%.
end

Background and Discussion:
The Harris County Flood Control District (District) and Harris County Purchasing have completed a review of the twelve(12) Statement of Qualifications on the above referenced project. The Evaluation Committee Panel reviewed and ranked all responses submitted by each firm based on the services they provide. Based on the results of our review, the Flood Control District request authorization to negotiate with the selected firm Resalire Infrastructure Solutions LLC on the basis of best overall evaluation for RFSQ - Professional Engineering Services for the Winfield Basin Feasibility Study and Site Plan.

Expected Impact:
It is expected to impact the project schedule, scope, costs, and grant administratio...