File #: 25-2295    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/28/2025 In control: Commissioners Court
On agenda: 4/10/2025 Final action: 4/10/2025
Title: Request for approval to execute an agreement with EJES Incorporated in the amount of $302,455.00 for Construction Phase Services in connection with Parkway (Mobile Homes) Subdivision Drainage Improvements - 2018, UPIN 19101MF17F01, Precinct 1, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
Sponsors: Mony Hossain
Attachments: 1. 25-2295-Award-UPIN 19101MF17F01-CPS-Parkway (Mobile Homes)-EJES Inc-P1-v01
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 1
Secondary Department Head/Elected Official: Rodney Ellis

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 19101MF17F01
Vendor/Entity Legal Name (if applicable): EJES Incorporated

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: 0% - Non-Divisible

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with EJES Incorporated in the amount of $302,455.00 for Construction Phase Services in connection with Parkway (Mobile Homes) Subdivision Drainage Improvements - 2018, UPIN 19101MF17F01, Precinct 1, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
end

Background and Discussion:
The Parkway (Mobile Homes) Subdivision is in Precinct 1, northeast Harris County, south of the intersection of Park Trail Dr. and Tidwell Rd. The subdivision is a residential mobile home neighborhood consisting of approximately 510 lots. The existing drainage system consists of concrete curb and gutter, and surface flow to a main trunkline drainage culvert that runs south and ultimately outfalls into HCFCD maintained ditch P122-00-00. The existing drainage pipe system is undersized and causes surface waters to back up at the intake areas. This causes localized flooding at the intersections of the roads. Floodplains and Historical Flooding data shows 307 homes were reported structural flooding post-Harvey. The scope of the project includes increasing storm sewer capacity in the existing systems by constructing a wet bottom detention basin.

Expected Impact:
This action will allow EJES...