File #: 25-2173    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 3/26/2025 In control: Commissioners Court
On agenda: 4/10/2025 Final action: 4/10/2025
Title: Request for approval to negotiate with Consor Engineers, LLC for Professional and Engineering services for the design of the Sam Houston Tollway North Pavement Surface Repairs design, bidding phase, and construction phase services (Precincts 1 & 3, MWBE Contracted Goal: 19.6%).
Primary Department: Toll Road Authority
Primary Department Head/Elected Official: Roberto Trevi?o, P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): Consor Engineers, LLC

MWBE Contracted Goal (if applicable): 19.6%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to negotiate with Consor Engineers, LLC for Professional and Engineering services for the design of the Sam Houston Tollway North Pavement Surface Repairs design, bidding phase, and construction phase services (Precincts 1 & 3, MWBE Contracted Goal: 19.6%).
end

Background and Discussion:
Pavement surface on Sam Houston Tollway North is due for maintenance in the section that was installed in 2019. The existing surface is an asphalt Permeable Friction Course (PFC) which currently has a 5-8 year life cycle and is beginning to show signs of delamination.

Expected Impact:
Improved Conditions and life expectancy for the Roadway.

Alternative Options:
No other recommended option for this identified need.

County Strategic Plan Goal: N/A
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A

Additional notes related to the Strategic Plan: N/A

Prior Court Action (if any): N/A
Date
Agenda Item #
Action Taken




Location:
Address (if applicable): N/A
Precinct(s): Precincts 1 & 3

Fiscal and ...