Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Negotiation
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): Tolunay-Wong Engineers, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to negotiate an agreement with Tolunay-Wong Engineers, Inc., to provide materials engineering and testing services countywide in support of maintenance projects.
end
Background and Discussion:
This is a request to authorize negotiation for an agreement that will provide materials engineering and testing services for construction projects throughout the County. The intent of these general maintenance projects is to conduct priority general drainage repairs in Harris County. Major emphasis of this repair work will be earthwork, including but not limited to erosion repair, slope failure repair, removal and disposal of sediment accumulations, granular fill and riprap installation, pipe removal and replacement, headwall and wingwall removal and replacement, concrete channel lining removal and replacement, concrete low-flow removal and replacement, outfall structure removal and replacement and related items. To confirm the work is done properly, a construction materials testing firm is needed.
Expected Impact:
Materials engineering and testing services under this agreement will provide essential quality control and assurance, ensuring that soils and construction materials meet specified standards and performance criteria,...