Title: Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) road easement and two (2) fee simple tracts for the public project known as Telge Rd Segment 6 - from 300-ft North of Grant Rd to 690-ft North of SH99 - 2014, for the purpose of roadway construction, UPIN 15104MF0DN03, Precinct 3.
Attachments: 1. 25-2157-Public Necessity-UPIN 15104MF0DN03-Telge6-P3-4-10-25
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: Not applicable

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

Project ID (if applicable): 15104MF0DN03
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) road easement and two (2) fee simple tracts for the public project known as Telge Rd Segment 6 - from 300-ft North of Grant Rd to 690-ft North of SH99 - 2014, for the purpose of roadway construction, UPIN 15104MF0DN03, Precinct 3.
end

Background and Discussion:
The project involves the design and construction of the proposed expansion of Telge Rd Segment 6 - from 300-ft North of Grant Road to 690-ft North of SH99 to result in a four-lane concrete boulevard. The project includes storm drain and sidewalks and detention basin mitigation and traffic signals.

Expected Impact:
The project will address current and future traffic volumes, reduce delays, and provide safe mobility for residents, pedestrians, and drivers.

Alternative Options:
If no action is taken, there will be delays in area mobility improvement.



County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.